contact
 

More distribution capacity for Lilly Pharma

• Gross floor area: 3,000 m2
• High-bay warehouse: 868 locations
• Project cost: EUR 10 million
• Annual volume handled:
  32 million medicine packs

Industry: Pharmaceuticals, Lilly Pharma Fertigung und Distribution
GmbH & Co. KG in Gießen, Germany

Wanted: Recipe for success in pharmaceutical logistics! To optimize and merge its storage and distribution of pharmaceutical products, Lilly Pharma needed a service provider with industry expertise and specific design skills.

The task: To engineer and build a new distribution center tailored to the customer's processes, with a refrigerated high-bay warehouse, a logistics line with shipping and receiving areas, and an office wing.

Special requirements: Compliance with strict GMP (Good Manufacturing Practices) requirements and stringent sanitary standards - even in the logistics section. Other special requirements were designed to optimize material flows, including separating the shipping and receiving areas.

The bottom line

Outstanding building performance and compelling financials. The customer benefited from our experience with logistics processes, facility management, obtaining permits, liaising with government agencies, and handling construction projects for the pharmaceutical industry.

We have a lot in store for our customers!

Infraserv Höchst's services

• Determining the status quo in planning preparations and engineering
• Blueprint and approval planning
Government-liaison services and licensing management
• Execution planning
Contract-award preparations and assistance with the awarding process
• Project development and construction supervision
• Property monitoring and documentation
• Scheduling and monitoring
• Providing a health and safety coordinator (SiGeKo) as required by the Construction-Site Ordinance (BaustellV)

Timeframe
Preliminary planning: 12 weeks
Execution: 54 weeks