More distribution capacity for Lilly Pharma
• Gross floor area: 3,000 m2• High-bay warehouse: 868 locations
• Project cost: EUR 10 million
• Annual volume handled:
32 million medicine packs
Industry: Pharmaceuticals, Lilly Pharma Fertigung und Distribution
GmbH & Co. KG in Gießen, Germany
Wanted: Recipe for
success in pharmaceutical
logistics! To optimize and merge its storage and distribution of pharmaceutical products, Lilly Pharma
needed a service provider with industry expertise and specific design skills.
The
task: To engineer and build a new distribution center tailored to the customer's processes, with a refrigerated
high-bay warehouse, a logistics line with shipping and receiving areas, and an office wing.
Special
requirements: Compliance with strict GMP (Good Manufacturing Practices) requirements and stringent sanitary
standards - even in the logistics section. Other special requirements were designed to optimize material
flows, including separating the shipping and receiving areas.
The bottom line
Outstanding building performance and compelling financials. The customer benefited from our experience with logistics processes, facility management, obtaining permits, liaising with government agencies, and handling construction projects for the pharmaceutical industry.
We have a lot in store for our customers!
Infraserv Höchst's services
![]() |
![]() |
|
|
• Determining
the status quo
in planning preparations and engineering • Blueprint and approval planning Government-liaison services and licensing management • Execution planning Contract-award preparations and assistance with the awarding process • Project development and construction supervision • Property monitoring and documentation • Scheduling and monitoring • Providing a health and safety coordinator (SiGeKo) as required by the Construction-Site Ordinance (BaustellV) Timeframe Preliminary planning: 12 weeks Execution: 54 weeks |
||
![]() |
![]() |




