More flexibility for the FIZ Frankfurt Biotechnology Innovation Center

• 4 office and laboratory modules, entrance module, underground garage
• Gross floor area: 13,900 m2
• Investment: EUR 23.9 million
  (incl. land)

Industry: Biotechnology/pharmaceuticals, FIZ Frankfurt Biotechnology Innovation Center in Frankfurt/Main, Germany

The future needs space! In a public-private partnership, the State of Hesse, the City of Frankfurt and CIC Hesse issued a request for proposals (RfP) for an innovation center with laboratories, pilot plants and communications rooms. The RfP was for planning and constructing an automated building that offered maximum flexibility to individualize the working environment. One challenge was particularly exciting: The tenants and their requirements were still not known during planning and construction, so the solutions had to be creative and versatile from the start.

The bottom line

Rooms with a future and flexibility: We successfully completed a fully functional and marketable property on schedule. And, since we factored in facility-management requirements during the design phase, the building can be run cost-effectively over the long term. The tenants say they are thrilled by the quality of the architecture and its technical capabilities.

Biotechnology that builds on competence!

Infraserv Höchst's services

• General contractor with responsibility for budgeting and scheduling during project planning and realization
• Designing the building complex with architects
• Planning building services and tenant-specific improvements, including the GMP area and laboratories with S3 safety ratings
• Turnkey construction of tenant-specific improvements
• Coordinating and commissioning all building services
• Supervising overall and specialized construction
• Coordinating compliance with the occupational-safety and -health requirements of the Construction-Site Ordinance (BaustellV)
• Sampling and disposing of excavated soil

Timeframe
• Engineering: September 2002 to February 2003
• Construction and installation, including laboratory equipment: January 2003 to March 2004
• Initial tenant move-in date: April 2004