More operational reliability for Fraport
•
Rehabilitated area, fire protection:
26,000 m2
•
Rehabilitated area, Nike store:
220 m2
•
ELA systems: 18 in 12 buildings
Industry: Airport operations, Fraport AG in Frankfurt/Main, Germany
Ready for boarding! Thanks to our cutting-edge expertise in construction supervision, fire protection and waste disposal, we made a three-point landing with Fraport AG, the operator of Frankfurt Airport.
Europe's second-largest aviation hub had a laundry list of important tasks - from improving fire protection for the counter areas and supervising the construction of the new Nike airport store to fully maintaining the electroacoustical systems and disposing of sewage sludge through to monitoring and evaluating ambient-air-quality monitors. In the process, all the individual measures had to be carefully coordinated on the various levels and in the areas next to Terminal 1. A crucial requirement: Nothing should slow down day-to-day operations!
The bottom line
The
construction measures were finished to specifications within the extremely tight schedule. By coming
to us, Fraport had obviously found the right partner, with comprehensive expertise in fire protection,
facility management, immission control and waste disposal.
Our team
successfully tackled one particularly daunting challenge: performing all the work during ongoing operations.
We planned and rebuilt the Nike store within the short construction period. By the way, this was the
only store in the new Skyline Arcade that was finished on schedule. We ensured the appropriate level
of functionality and liability for the various areas.
Ready to take
off into a safe future!
Infraserv Höchst's services
![]() |
![]() |
|
|
Counter
areas • Gutting and rebuilding the back offices of the check-in areas in Halls A and B according to current building laws • Equipping the high-traffic and counter areas of the departure level and the hall ceiling with low-pressure ceiling systems for large-scale removal of smoke and exhaust • Removing smoke with smoke extraction fans on the roof of Terminal 1 • Installing hanging scaffolds on the hall ceiling so as not to impede terminal business during construction During terminal operations, construction could only be performed between 10 p.m. and 5 a.m. in the publicly accessible areas. Provisional check-in counters were provided while the check-in areas were being modernized. Nike airport store • Planning and rebuilding the Nike store in the airport's new Skyline Arcade, smoothly coordinating interfaces with adjacent areas and tenants • Ensuring all the materials and components satisfied strict fire-protection requirements • Meeting the extremely tight schedule of 39 calendar days (24/7) ELA centers Full maintenance, repair and inspection of 18 ELA centers - all in safety-relevant areas and from different vendors Sewage-sludge disposal All-in-one logistics and disposal service for liquid sludge: • Providing suitable transport vehicles • Removing and transporting the liquid sludge to Industriepark Höchst • Compressing the sludge • Disposing of wastewater at the wastewater-treatment facility in Industriepark Höchst • Incinerating the thickened sludge at the sewage-sludge-incineration plant in Industriepark Höchst Ambient-air-quality monitors • Verifying the functionality of the three ambient-air-quality monitors at Frankfurt Airport • Monitoring and analyzing the monitors' measurements and calibrations online • Fast on-site response if measurements and calibrations deviate Timeframe Customer as of September 2003 |
||
![]() |
![]() |