More time for research at sanofi-aventis

• Leasable area: Approx. 1,800 m2
• Monitoring 1,000 data points
• Building cost: EUR 10 million

Industry: Pharmaceuticals, Sanofi-Aventis Deutschland GmbH in Frankfurt/Main, Germany

We shine when expectations are high. Take, for example, sanofi-aventis and its expectations as a global player in the pharmaceuticals industry.

The company wanted fully functional laboratories with an attractive financing model. In other words, to eliminate any balance sheet impact, it wanted to rent, and not own, the facilities.

The requirements in detail: Planning, constructing and running a laboratory and pilot plant building for production-related research and development. This included operating the telephone and data network, and monitoring the building automation systems.

Since drugs would also be manufactured in small lot sizes for testing purposes, we had to meet extremely strict standards. After all, the building had to conform to stringent GMP (Good Manufacturing Practices) requirements - during planning, construction and operation.

The bottom line

This demanding customer was perfectly satisfied. Not only with the project's financial performance, but also with the construction and functionality of the laboratory and clean rooms, which were tailored to its specific needs. Our team delivered guaranteed systems availability and functionality without financing expenses. And that improved sanofi-aventis's cash flow and allowed it to devote its full attention to its core business.

We delivered a customer-oriented, compelling solution that drew on our construction and financing competencies.

Infraserv Höchst's services

Planning, financing and constructing the building as the general contractor
• Project management
• Coordinating all the building systems and clean-room equipment
• Installing laboratory systems
• Supporting GMP qualification and validation

Operating the building in strict compliance with clean-room classes A-D etc.
• Maintaining and operating all the building services according to the functionality agreement and stipulated response times
• Maintaining the clean-room equipment (e.g., sterilizers, freeze-dryers, isolator)
• Guaranteed functionality (e.g., temperature, humidity, particle limit for the various clean-room classes) and system availability (specified response times in the event of breakdowns of the building services and clean-room equipment)
• Connecting approx. 1,000 data points to the Infraserv Höchst Building Control Center to monitor functionality and system availability
• Operating communications infrastructure (VoIP systems, PC)

Timeframe
• Construction start: October 2004
• Completion: November 2005