Pen production facility for Sanofi
Location: Industriepark Höchst
Sanofi, one of the world's leading pharmaceutical companies, was planning the construction of a new production facility for "diabetes pens" – the products would be assembled and packaged in four halls. It also required testing labs, administrative offices, an incoming goods center, a high-bay warehouse and a temperature-controlled storage aisle. Infraserv Höchst completed the project in a record-breaking 15 months without interrupting operations and demonstrated world-class expertise in design, permitting, construction and operation.
Our services:
- Developing a facility management system to support GMP-compliant operation
- Developing an implementation strategy from the trial run to regular operation
- Quality management and auditing
- End-to-end operation, including heating, ventilation and air-conditioning (HVAC), utilities, waste management and plant management
FACTS AND FIGURES |
Total area: 28,000 m2, 15,000 positions in the high-bay warehouse, production volume: approx. 100 mn pens/year |